Newburgh Lake Sediment Core Sampling and Analysis
Part 1 (163k)
1.0 - INTRODUCTION
Part 2 (294k)
2.0 - STATION SELECTION
3.0 - EQUIPMENT AND SUPPLIES
4.0 - PROCEDURES FOR COLLECTING THE CORE
Part 3 (200k)
5.0 - SAMPLING THE CORE
6.0 - ON-SITE CONTAMINANT ANALYSIS--METHODS
Part 4 (1,308k)
7.0 - RESULTS --FIELD OBSERVATIONS AND FIELD ANALYSES
Part 5 (453k)
8.0 - COMPARISON OF FIELD AND LABORATORY ANALYSES
9.0 - SUMMARY AND CONCLUSIONS
Part 6 (117k)
APPENDIX A - ROSSFELDER EQUIPMENT INFORMATION
Part 7 (4k)
APPENDIX B - FIELD LOG SHEETS
Part 8 (314k)
APPENDIX C - TOTAL SOLIDS DATA
Part 9 (646k)
APPENDIX D - PCB DATA
Part 10 (544k)
APPENDIX E - PAH DATA
Part 11 (4k)
APPENDIX F - METALS DATA
Part 12 (58k)
APPENDIX G - CONFIRMATORY ANALYSIS
APPENDIX H - GLOSSARY
APPENDIX I - REFERENCES
|